<%@LANGUAGE="VBSCRIPT" CODEPAGE="65001"%> The preparation work before jaw crusher starting and its daily maintenance -- Mining machinery manufacturers Vipeak
Home         About us         News         Product          International Trade         Honors          After-Sales Service         Contact Us


Welcome to Zhengzhou Mining machinery manufacturers Vipeak Machinery Co., Ltd

Situated in High and New Technical Industry Development Area, Zhenghzou, China, Zhengzhou Mining machinery manufacturers Vipeak Machinery Co., Ltd. is a high-tech company , cooperating with Sveadaka Company to develop and produce industrial mills.

     Current Position  News Center -- The preparation work before jaw crusher starting and its daily maintenance
Product List
  Mill Machine
HGM Series Micropowder Grinder
Raymond Mill
Straight Centrifugal Grinder
High Pressure Suspension Grinder
High Pressure Micro-powder Grinder
Ball Mill
Jaw Crusher
Impact crusher
PY Series Spring Cone Crusher
Hydraulic Cone Crusher
Symons cone crusher
Hammer crusher
   Production Line
Stone Crushing & Screening Plants
Sand Making & Washing Plants
   Sand Making & Screening
Sand Making Machine
Sand Washing Machine
Circular Vibrating Screen
Belt Conveyer
Vibrating Feeder
  Beneficiation Equipment
Drying Machine
Condensing Machine
Spiral Separator
Magnetic Separator
Flotation Machine
The preparation work before jaw crusher starting and its daily maintenance

(I) Preparations before start
1. Check lubrication of bearings and guarantee adequate lubricant inside bearings and on joint of ancon.
2. Check carefully all tightness.
3. Change the abraded belt and clean the oil stain on belt and belt pulley with clean duster cloth.
4. Cancel unsecured protection devices.
5. Clean ore or other things in crushing chamber.
(II) Start jaw crusher
1. Start under normal driving conditions.
2. Start only under no load.
3. Stop and get rid of hidden trouble when abnormal thing occurs.
(III) Maintenance and use:
1. Feeding equipment after normal running.
2. Material shall be fed evenly in order to prevent side load or side weight increase.
3. Generally, temperature rise o bearing shall not exceed 35oC and maximum temperature shall not exceed 70oC, or stop and get rid of the trouble.
4. Stop feeding before stopping equipment, and cut motor after completely discharging materials in chamber.
5. Cut motor immediately when equipment is stopped by materials block and restart the equipment after completely discharging materials in chamber.
6. Change the abraded end for the other end.
(IV) Lubrication:
1. Guarantee friction surface lubricated always in order to keep normal running and prolong service life of equipment.
2. Calcium grease, sodium grease and calcium sodium grease can be applied to the equipment in terms of application location and temperature.
3. The added lubricant is 50-70% volume of bearing pedestal and shall be changed every three months. Clean track of bearing roller by clean gas or coal oil when lubricant is changed.
4. When ancon plate contacts gasket, lubricant shall be added before starting equipment.

   Mill Series   |   Crusher Series   |   Mine Selection Machine   |   Fittings
Add: National High& New technical Industry Development Zone, zhengzhou, China     Postcode: 450007
International Trade Department Tel0086-371-67771005 0086-371-67770980     Fax0086-371-67775288
Emailvipeak111@yahoo.com     MSN violabb@hotmail.com